No. 9 3rd St., Banaba, San Mateo, Rizal (near Batasan Hills, Quezon City and Nangka, Marikina City Border) - Click here for google map pin
Smart No. : 09628434722
Email Address : smartbuildprime@gmail.com

House / Building Construction
Rough Construction Cost Estimates:
-
Economical Finish: ₱20,000 - ₱30,000 per square meter
-
Regular Finish: ₱25,000 - ₱35,000 per square meter
-
Semi-Elegant Finish: ₱25,000 - ₱40,000 per square meter
-
Elegant Finish: ₱30,000 and above per square meter
For a visual description of these finishes, you may click: Types of Finishes.
To know how you can save 10% - 20% from traditional contractors click: SMARTBUILD'S OWNER-MANAGED CONSTRUCTION SYSTEM
To get a rough estimate for your project click: Building Cost Calculator
Important Note:
Estimating costs based solely on square meter rates provides a rough guide and is primarily used during the design stage. For instance:
-
A 36-square-meter master bedroom can be elegantly finished at approximately ₱25,000 per square meter.
-
The same 36-square-meter area divided into two bedrooms, two bathrooms, and a kitchen may cost ₱35,000 per square meter with only economical finishes.
This difference arises due to the increased complexity, such as partitions, doors, plumbing, and electrical systems.
To ensure accuracy, detailed plans (at least a floor plan) are essential for precise cost estimation.
Condominium Unit or Commercial Unit Fit-Outs and Renovations
Rough Construction Cost Estimates:
-
Fit-Out (including cabinetry and furniture): ₱20,000 - ₱50,000 per square meter
-
Fit-Out Only: ₱10,000 - ₱30,000 per square meter
-
Renovation Only: ₱10,000 - ₱30,000 per square meter
Please note that these figures are intended for budgetary planning and may vary based on project specifics. For a detailed breakdown of construction costs or to discuss value-engineered solutions, feel free to visit or contact our office.
Building Cost Calculator Rough Estimates
To estimate costs, calculate the total floor area, including the garage, balcony, lanai, and other spaces. Enter this into our Building Cost Calculator for a rough estimate. Please note this is a rough estimate only. For a visual description of these finishes, you may
click: Types of Finishes.
(CLICK THE VIDEO TO KNOW HOW TO SAVE 10% - 20%)
Traditional contractors usually provide a lump-sum contract that includes contractor profit, contractor overhead, business taxes, material markups, contingencies, and risk allowances.
SmartBuild uses a different approach called Professional Construction Administration with a Guaranteed Maximum Project Cost System.
This system allows the Owner to retain control of the project funds while SmartBuild professionally manages, supervises, coordinates, and monitors the construction process.
STEP 1 — PLANS, ESTIMATE, AND PROJECT PREPARATION
Before construction begins, SmartBuild reviews the plans and prepares:
✔ Detailed Cost Estimate
✔ Construction Schedule
✔ Procurement Schedule
✔ Work Packages
✔ Manpower Plan
✔ Construction Methodology
This creates a clear roadmap before any major spending occurs.
STEP 2 — SOURCING AND SCREENING OF WORKERS
SmartBuild helps source and evaluate:
✔ Foremen
✔ Carpenters
✔ Masons
✔ Steelworkers
✔ Electricians
✔ Plumbers
✔ Painters
✔ Specialty Trade Teams
We evaluate experience, workmanship, references, availability, and pricing.
The Owner reviews and approves the recommended workers.
The Owner then directly pays approved labor.
STEP 3 — MATERIAL PROCUREMENT AND SUPPLIER CANVASSING
SmartBuild computes required quantities and canvasses multiple suppliers.
We compare:
✔ Price
✔ Quality
✔ Specifications
✔ Delivery Schedule
✔ Warranty Coverage
✔ Available Bulk Discounts
The Owner chooses the supplier and directly pays the supplier.
This helps eliminate hidden material markups.
STEP 4 — CONSTRUCTION SUPERVISION AND PROJECT MANAGEMENT
During construction, SmartBuild assists with:
✔ Site Supervision
✔ Quality Control
✔ Scheduling
✔ Cost Monitoring
✔ Billing Verification
✔ Procurement Monitoring
✔ Progress Reporting
✔ Coordination Among Trades
We help ensure that the work follows the approved plans, specifications, schedule, and budget.
STEP 6 — MAXIMUM GUARANTEED PROJECT COST
Before construction begins, SmartBuild prepares a detailed estimate based on:
✔ Approved Plans
✔ Approved Specifications
✔ Defined Scope of Work
✔ Construction Schedule
✔ Current Market Pricing
Using these documents, SmartBuild provides a proposed:
SMARTBUILD'S OWNER-MANAGED CONSTRUCTION SYSTEM
MAXIMUM GUARANTEED PROJECT COST
This establishes a target maximum project cost before construction starts.
WHAT IF COSTS EXCEED THE GUARANTEED AMOUNT?
If project costs exceed the adjusted Maximum Guaranteed Project Cost due to matters attributable to SmartBuild's estimating, planning, procurement recommendations, coordination, supervision, management, or administration, the excess shall be charged against SmartBuild's professional fee, subject to the terms of the written agreement.
This creates accountability and helps align SmartBuild's interests with the Owner's interests.
Adjustments may still apply for:
✔ Owner-requested changes
✔ Additional works outside the original scope
✔ Upgraded materials or finishes
✔ Changes in plans or specifications
✔ Unforeseen site conditions
✔ Government or utility-company requirements
✔ Other contractually recognized adjustments
STEP 7 — OUR INCENTIVE IS TO REDUCE COSTS
Traditional contractors often earn more when project costs increase because their profit, overhead, and markups are built into the construction price.
SmartBuild's system is different.
WE EARN BY CONTROLLING YOUR COST — NOT BY INCREASING IT.
We help reduce unnecessary construction costs through:
✔ Value Engineering
✔ Competitive Supplier Canvassing
✔ Bulk Material Discounts
✔ Open-Book Procurement
✔ Quantity Verification
✔ Cost Monitoring and Control
✔ Efficient Scheduling and Coordination
Through proper planning, transparent procurement, and professional project management, clients may potentially save approximately 10%–20%, depending on project scope, specifications, location, procurement results, and market conditions.